We offer on-site
installation and training providing a turnkey system.
If you already have data
in electronic form, we can import it into your Merlin MRP System
for you, for really quick start-up! |
Merlin MRP Factory
Home Screen
System OverView Download - install - start work straight
away!
Merlin MRP Factory 8 is the
most powerful version yet of our renowned MRP software, the product of
constant software development since 1992. It is optimised for
use under Windows 10, but will run happily on all
Windows versions. Moreover, with
the Easy Learn interface (see below) you
can download, install, and start working with it today.
The
Educational & Learning User Licence for Merlin MRP Software is free of charge!
The system will manage your production
needs, production line availability, subassembly and materials
requirements, and will raise works order, subassembly jobs and
purchase orders to procure and schedule everything that is required
for your production run.
With the Flow-Chart Home screen, you can start working straight away
by following the steps and the instructions for each process.
Work through all 8 buttons and you will have created and despatched
your first production job!

Each production processes is tracked
through the shop floor, and you can see at a glance the status and
progress of all your jobs.
For more information, please follow the links in the left-hand column,
and in particular if you fancy a bit of reading, and would like to
learn more, please click the Detailed
Product Description link.
The MRP process can be run for a single
job, for a group (series) of jobs, or for you entire production
schedule. Simple button clicks accomplish all of the processing
very rapidly, and all stock movements through subassemby works orders
and sub-jobs, purchase of materials, allocation of materials, issue of
materials to WiP
and transfer to final assemblies occur quickly and automatically. |